CHECKLIST FOR DREDGE AND FILL APPLICATIONS

Name of Applicant:_______________________
Name of Project:_________________________
Location of Project: __________________________________________________________________________
Date of Application:_________________   NHWB File #____________________  
Date of Meeting with Milford Conservation Commission:____________________
Date of On-Site Inspection:_____________________
Copy of Milford Wetland Conservation District Ordinance given:____________________

  1. WETLAND(S) INVOLVED:
    1. Type:
      Bog ___________________ Marsh  ___________________
      Pond ___________________ Stream ___________________
      Wooded Swamp ___________________ Vernal Pool ___________________
      Other ___________________
    2. Type of Vegetation present: ____________________

    3. Size of wetland disturbed:  ___________________
    4. Connection to other wetlands:
      Isolated: ___________________
      Adjacent to open water: Describe: 

      Width of stream involved: ___________________
      Part of a drainage system. Describe:

    5. Value of disturbed wetland for:
      Flood storage: _________________________________________________________________
      Water quality protection:  ___________________________________________________
      Wildlife habitat value: ________________________________________________________
      Rare, threatened or endangered species: ________________________________________
    6. Previous disturbance of wetland involved? Describe:

    7. Unusual Issues:
      Previous violations: _________________________________
      Current violations: __________________________________
      Applicant is (is not) owner of property:
    8. Impacts on wetlands as specified on application. Describe:

    9. Photographs:
      Requested:  ____________________
      Received: ____________________
      Duplicates required. ____________________

  2. RELATED ISSUES:
    1. Need for the project: ____________________
    2. Plans as presented do (do not) correctly locate wetlands on entire parcel. If not describe discrepancies:

    3. Information on application appears (does not appear) correct. Describe if in the negative:

  3. PROJECT IMPACT:
    1. Percentage of area of wetland affected: ____________________
    2. Effect on drainage: ____________________________________________________________
    3. Alternatives to minimize wetland impact:
      Available? Describe:

      Cooperation refused?:

      Reduction in sq.ft. of impact by using alternatives:
      Wetlands: ____________________ Buffer Zone: ____________________
    4. Potential problems on site before and/or after:
      Erosion:  ________________________________________
      Siltation: ________________________________________
      Increased flooding: ________________________________________
    5. Impact on abutters:
      Erosion: ________________________________________
      Siltation: ________________________________________
      Flooding: ________________________________________
    6. Conditions to be on Dredge and Fill Permit to avoid or reduce further wetland impact:
      No further disturbance of wetlands involved: ________________________________________
      No disturbance of any other wetlands on site: ________________________________________
      Erosion and siltation control needed: ________________________________________
      Fill removed to be placed out of wetlands and Buffer Zone: ____________________
      Stabilization recommended:
      Vegetative: ________________________________________
      Rip rap: ________________________________________
      Assistance from SCS required: ________________________________________
      Report received:  ________________________________________
      Reference to State and Local regulations on Wetlands and Buffer Zones ___________________
      requested to be included in property deeds: ________________________________________
    7. Dredge and Fill application and Milford Conservation Commission recommendations sent to Army Corps of Engineers: ____________________
    8. DREDGE AND FILL PERMIT/RECORDED AT REGISTRY OF DEEDS: Recording required: ____________________
      Date recorded: ____________________
      Book and Page #: ____________________

  4. ADDITIONAL COMMENTS:





  5. DENIAL/APPROVAL:
    We have no objections to the proposal as presented on plans dated: ____________________
    We recommend denial to the proposal as presented on plans dated: ____________________


  6. FIRE PONDS AND OTHER MAN-MADE PONDS
    Note:
    1. Wetlands Board does not approve of fire ponds being built in wetlands when this results in the loss of a wet1ands of greater value than the fire pond would be.
    2. Wetlands Board recommends that in all cases of man-made ponds, islands of higher ground be included in the pond for the benefit of wildlife, and to avoid the "sterile" environment.
    Type of Pond: ____________________
    Reasons for the pond: ________________________________________
    Size of pond: ____________________
    Types of Soils involved: ________________________________________
    Nature of Wetlands to be disturbed:

    Recommendations for relocation of pond:

    SCS assistance required: ____________________
    SCS report received: ____________________
    Banks of pond to be vegetated: ____________________
    SCS recommendations for vegetation required: ____________________
    Islands for wildlife required: ____________________
    a. Size of island(s): ____________________
    b. Number of islands required: ____________________
    c. Height of island above water: ____________________
    d. Vegetation required: ____________________
    SCS recommendations required: ____________________
    SCS report received: ____________________
    Slope of pond banks: 4:1 to 6:1  ____________________
    Dredged material to be taken out of jurisdiction of wetlands: ____________________
    To be used on site for: ____________________
DENIAL/APPROVAL
We have no objections to the proposal as presented on plans dated  ____________________
We recommend denial to the proposal as presented on plans dated ____________________